{"id":928,"date":"2014-01-30T21:48:24","date_gmt":"2014-01-30T21:48:24","guid":{"rendered":"http:\/\/www.dannysteyn.com\/blog\/?p=928"},"modified":"2020-01-20T21:52:17","modified_gmt":"2020-01-20T21:52:17","slug":"07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish","status":"publish","type":"post","link":"http:\/\/www.dannysteynstudios.com\/blog\/07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish\/","title":{"rendered":"Build Out Phase (Part 3) \u2013 New Photography Studio design project from start to finish"},"content":{"rendered":"<h1>Drywall is complete<\/h1>\n<p>We are 6 weeks into the project, and allowing for the break between Christmas and New Year, things are going pretty smoothly. The GC is keeping the project moving along, but to date we have drifted about 2 weeks behind our original schedule. Not a train smash but still a bit disappointing.<\/p>\n<p>All the interior drywalls are all complete. Both Studios as well as the Prop Room and the Gallery will have open ceilings, and these areas all received their dose of matte black paint. There will be some touch up required with the new AC vents that are still being installed.<\/p>\n<div id=\"attachment_926\" style=\"width: 1390px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0012.jpg\"><img aria-describedby=\"caption-attachment-926\" loading=\"lazy\" class=\"size-full wp-image-926\" alt=\"Photography studio Editing Office dry-wall complete\" src=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0012.jpg\" width=\"1380\" height=\"925\" srcset=\"http:\/\/www.dannysteynstudios.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0012.jpg 1380w, http:\/\/www.dannysteynstudios.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0012-300x201.jpg 300w, http:\/\/www.dannysteynstudios.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0012-1024x686.jpg 1024w\" sizes=\"(max-width: 1380px) 100vw, 1380px\" \/><\/a><p id=\"caption-attachment-926\" class=\"wp-caption-text\">Photography studio Editing Office dry-wall complete<\/p><\/div>\n<div id=\"attachment_925\" style=\"width: 1390px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0011.jpg\"><img aria-describedby=\"caption-attachment-925\" loading=\"lazy\" class=\"size-full wp-image-925\" alt=\"Photography studio Prop Room dry-wall complete\" src=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0011.jpg\" width=\"1380\" height=\"925\" srcset=\"http:\/\/www.dannysteynstudios.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0011.jpg 1380w, http:\/\/www.dannysteynstudios.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0011-300x201.jpg 300w, http:\/\/www.dannysteynstudios.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0011-1024x686.jpg 1024w\" sizes=\"(max-width: 1380px) 100vw, 1380px\" \/><\/a><p id=\"caption-attachment-925\" class=\"wp-caption-text\">Photography studio Prop Room dry-wall complete<\/p><\/div>\n<div id=\"attachment_927\" style=\"width: 1390px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0013.jpg\"><img aria-describedby=\"caption-attachment-927\" loading=\"lazy\" class=\"size-full wp-image-927\" alt=\"Photography studio Lobby dry-wall complete.\" src=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0013.jpg\" width=\"1380\" height=\"925\" srcset=\"http:\/\/www.dannysteynstudios.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0013.jpg 1380w, http:\/\/www.dannysteynstudios.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0013-300x201.jpg 300w, http:\/\/www.dannysteynstudios.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0013-1024x686.jpg 1024w\" sizes=\"(max-width: 1380px) 100vw, 1380px\" \/><\/a><p id=\"caption-attachment-927\" class=\"wp-caption-text\">Photography studio Lobby dry-wall complete.<\/p><\/div>\n<h1>Floor tiling has commenced<\/h1>\n<p>The floor guys have started laying tile in the Lobby, Office and Gallery areas. We had to make a small design change in the Lobby due to the layout of the doors. Unfortunately this means more of one tile and less of another so the lobby will only be completed on Saturday. We had so many compliments on the lobby of our old studio that we have stayed with the same floor design; a dark marble border around a light marble fill. Doors will be black with frosted glass panels.<\/p>\n<div id=\"attachment_930\" style=\"width: 1390px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0003.jpg\"><img aria-describedby=\"caption-attachment-930\" loading=\"lazy\" class=\"size-full wp-image-930\" alt=\"New Photography Studio construction - Entrance Lobby tiling underway\" src=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0003.jpg\" width=\"1380\" height=\"925\" srcset=\"http:\/\/www.dannysteynstudios.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0003.jpg 1380w, http:\/\/www.dannysteynstudios.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0003-300x201.jpg 300w, http:\/\/www.dannysteynstudios.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0003-1024x686.jpg 1024w\" sizes=\"(max-width: 1380px) 100vw, 1380px\" \/><\/a><p id=\"caption-attachment-930\" class=\"wp-caption-text\">New Photography Studio construction &#8211; Entrance Lobby tiling underway<\/p><\/div>\n<div id=\"attachment_931\" style=\"width: 1390px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0005.jpg\"><img aria-describedby=\"caption-attachment-931\" loading=\"lazy\" class=\"size-full wp-image-931\" alt=\"New Photography Studio construction - Entrance Lobby tiling underway\" src=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0005.jpg\" width=\"1380\" height=\"925\" srcset=\"http:\/\/www.dannysteynstudios.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0005.jpg 1380w, http:\/\/www.dannysteynstudios.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0005-300x201.jpg 300w, http:\/\/www.dannysteynstudios.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0005-1024x686.jpg 1024w\" sizes=\"(max-width: 1380px) 100vw, 1380px\" \/><\/a><p id=\"caption-attachment-931\" class=\"wp-caption-text\">New Photography Studio construction &#8211; Entrance Lobby tiling underway<\/p><\/div>\n<div id=\"attachment_932\" style=\"width: 1390px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0008.jpg\"><img aria-describedby=\"caption-attachment-932\" loading=\"lazy\" class=\"size-full wp-image-932\" alt=\"New Photography Studio construction - Editing Office tiling underway\" src=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0008.jpg\" width=\"1380\" height=\"925\" srcset=\"http:\/\/www.dannysteynstudios.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0008.jpg 1380w, http:\/\/www.dannysteynstudios.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0008-300x201.jpg 300w, http:\/\/www.dannysteynstudios.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0008-1024x686.jpg 1024w\" sizes=\"(max-width: 1380px) 100vw, 1380px\" \/><\/a><p id=\"caption-attachment-932\" class=\"wp-caption-text\">New Photography Studio construction &#8211; Editing Office tiling underway<\/p><\/div>\n<p>We chose a busier and slightly darker tile for the Editing Room as the light cream tiles in our previous studio editing room showed the dirt too easily.<\/p>\n<div id=\"attachment_933\" style=\"width: 1390px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0011.jpg\"><img aria-describedby=\"caption-attachment-933\" loading=\"lazy\" class=\"size-full wp-image-933\" alt=\"New Photography Studio construction - Studio walls and window frames being painted\" src=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0011.jpg\" width=\"1380\" height=\"925\" srcset=\"http:\/\/www.dannysteynstudios.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0011.jpg 1380w, http:\/\/www.dannysteynstudios.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0011-300x201.jpg 300w, http:\/\/www.dannysteynstudios.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0011-1024x686.jpg 1024w\" sizes=\"(max-width: 1380px) 100vw, 1380px\" \/><\/a><p id=\"caption-attachment-933\" class=\"wp-caption-text\">New Photography Studio construction &#8211; Studio walls and window frames being painted<\/p><\/div>\n<h2>Interior oors are being custom made on site<\/h2>\n<p>Due to long lead times we were unable to purchase finished doors so we are having the GC custom make the doors on site. The finish carpenter is doing a great job with the 8ft tall wood doors that we purchased. He has cut out the recesses and is painstakingly installing the frosted glass panels<\/p>\n<div id=\"attachment_934\" style=\"width: 1390px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0024.jpg\"><img aria-describedby=\"caption-attachment-934\" loading=\"lazy\" class=\"size-full wp-image-934\" alt=\"New Photography Studio construction - 8ft tall doors being custom made on site\" src=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0024.jpg\" width=\"1380\" height=\"925\" \/><\/a><p id=\"caption-attachment-934\" class=\"wp-caption-text\">New Photography Studio construction &#8211; 8ft tall doors being custom made on site<\/p><\/div>\n<div id=\"attachment_935\" style=\"width: 1390px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0004.jpg\"><img aria-describedby=\"caption-attachment-935\" loading=\"lazy\" class=\"size-full wp-image-935\" alt=\"New Photography Studio construction - 8ft tall doors being custom made on site\" src=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0004.jpg\" width=\"1380\" height=\"925\" \/><\/a><p id=\"caption-attachment-935\" class=\"wp-caption-text\">New Photography Studio construction &#8211; 8ft tall doors being custom made on site<\/p><\/div>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Drywall is complete We are 6 weeks into the project, and allowing for the break between Christmas and New Year, things are going pretty smoothly. The GC is keeping the project moving along, but to date we have drifted about &hellip; <a href=\"http:\/\/www.dannysteynstudios.com\/blog\/07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[8],"tags":[31,47,77,78,79,99,100],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Build Out Phase (Part 3) \u2013 New Photography Studio design project from start to finish - Danny Steyn Studios - Photography<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"http:\/\/www.dannysteynstudios.com\/blog\/07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Build Out Phase (Part 3) \u2013 New Photography Studio design project from start to finish - Danny Steyn Studios - Photography\" \/>\n<meta property=\"og:description\" content=\"Drywall is complete We are 6 weeks into the project, and allowing for the break between Christmas and New Year, things are going pretty smoothly. The GC is keeping the project moving along, but to date we have drifted about &hellip; Continue reading &rarr;\" \/>\n<meta property=\"og:url\" content=\"http:\/\/www.dannysteynstudios.com\/blog\/07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish\/\" \/>\n<meta property=\"og:site_name\" content=\"Danny Steyn Studios - Photography\" \/>\n<meta property=\"article:published_time\" content=\"2014-01-30T21:48:24+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-01-20T21:52:17+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0012.jpg\" \/>\n<meta name=\"twitter:card\" content=\"summary\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"dannystu\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"http:\/\/www.dannysteynstudios.com\/blog\/#website\",\"url\":\"http:\/\/www.dannysteynstudios.com\/blog\/\",\"name\":\"Danny Steyn Studios - Photography\",\"description\":\"South Florida&#039;s Pro Photography Studio located in Fort Lauderdale\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"http:\/\/www.dannysteynstudios.com\/blog\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"ImageObject\",\"@id\":\"http:\/\/www.dannysteynstudios.com\/blog\/07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish\/#primaryimage\",\"inLanguage\":\"en-US\",\"url\":\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0012.jpg\",\"contentUrl\":\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0012.jpg\"},{\"@type\":\"WebPage\",\"@id\":\"http:\/\/www.dannysteynstudios.com\/blog\/07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish\/#webpage\",\"url\":\"http:\/\/www.dannysteynstudios.com\/blog\/07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish\/\",\"name\":\"Build Out Phase (Part 3) \u2013 New Photography Studio design project from start to finish - Danny Steyn Studios - Photography\",\"isPartOf\":{\"@id\":\"http:\/\/www.dannysteynstudios.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"http:\/\/www.dannysteynstudios.com\/blog\/07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish\/#primaryimage\"},\"datePublished\":\"2014-01-30T21:48:24+00:00\",\"dateModified\":\"2020-01-20T21:52:17+00:00\",\"author\":{\"@id\":\"http:\/\/www.dannysteynstudios.com\/blog\/#\/schema\/person\/77f24db04c46591664c27ac7a0cb8a1d\"},\"breadcrumb\":{\"@id\":\"http:\/\/www.dannysteynstudios.com\/blog\/07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"http:\/\/www.dannysteynstudios.com\/blog\/07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"http:\/\/www.dannysteynstudios.com\/blog\/07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"http:\/\/www.dannysteynstudios.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Build Out Phase (Part 3) \u2013 New Photography Studio design project from start to finish\"}]},{\"@type\":\"Person\",\"@id\":\"http:\/\/www.dannysteynstudios.com\/blog\/#\/schema\/person\/77f24db04c46591664c27ac7a0cb8a1d\",\"name\":\"dannystu\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"http:\/\/www.dannysteynstudios.com\/blog\/#personlogo\",\"inLanguage\":\"en-US\",\"url\":\"http:\/\/0.gravatar.com\/avatar\/f007deaacf7b999368dd6553e456b5f9?s=96&d=mm&r=g\",\"contentUrl\":\"http:\/\/0.gravatar.com\/avatar\/f007deaacf7b999368dd6553e456b5f9?s=96&d=mm&r=g\",\"caption\":\"dannystu\"},\"url\":\"http:\/\/www.dannysteynstudios.com\/blog\/author\/dannystu\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Build Out Phase (Part 3) \u2013 New Photography Studio design project from start to finish - Danny Steyn Studios - Photography","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"http:\/\/www.dannysteynstudios.com\/blog\/07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish\/","og_locale":"en_US","og_type":"article","og_title":"Build Out Phase (Part 3) \u2013 New Photography Studio design project from start to finish - Danny Steyn Studios - Photography","og_description":"Drywall is complete We are 6 weeks into the project, and allowing for the break between Christmas and New Year, things are going pretty smoothly. The GC is keeping the project moving along, but to date we have drifted about &hellip; Continue reading &rarr;","og_url":"http:\/\/www.dannysteynstudios.com\/blog\/07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish\/","og_site_name":"Danny Steyn Studios - Photography","article_published_time":"2014-01-30T21:48:24+00:00","article_modified_time":"2020-01-20T21:52:17+00:00","og_image":[{"url":"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0012.jpg"}],"twitter_card":"summary","twitter_misc":{"Written by":"dannystu","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"http:\/\/www.dannysteynstudios.com\/blog\/#website","url":"http:\/\/www.dannysteynstudios.com\/blog\/","name":"Danny Steyn Studios - Photography","description":"South Florida&#039;s Pro Photography Studio located in Fort Lauderdale","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"http:\/\/www.dannysteynstudios.com\/blog\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"ImageObject","@id":"http:\/\/www.dannysteynstudios.com\/blog\/07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish\/#primaryimage","inLanguage":"en-US","url":"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0012.jpg","contentUrl":"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0012.jpg"},{"@type":"WebPage","@id":"http:\/\/www.dannysteynstudios.com\/blog\/07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish\/#webpage","url":"http:\/\/www.dannysteynstudios.com\/blog\/07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish\/","name":"Build Out Phase (Part 3) \u2013 New Photography Studio design project from start to finish - Danny Steyn Studios - Photography","isPartOf":{"@id":"http:\/\/www.dannysteynstudios.com\/blog\/#website"},"primaryImageOfPage":{"@id":"http:\/\/www.dannysteynstudios.com\/blog\/07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish\/#primaryimage"},"datePublished":"2014-01-30T21:48:24+00:00","dateModified":"2020-01-20T21:52:17+00:00","author":{"@id":"http:\/\/www.dannysteynstudios.com\/blog\/#\/schema\/person\/77f24db04c46591664c27ac7a0cb8a1d"},"breadcrumb":{"@id":"http:\/\/www.dannysteynstudios.com\/blog\/07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["http:\/\/www.dannysteynstudios.com\/blog\/07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish\/"]}]},{"@type":"BreadcrumbList","@id":"http:\/\/www.dannysteynstudios.com\/blog\/07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"http:\/\/www.dannysteynstudios.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Build Out Phase (Part 3) \u2013 New Photography Studio design project from start to finish"}]},{"@type":"Person","@id":"http:\/\/www.dannysteynstudios.com\/blog\/#\/schema\/person\/77f24db04c46591664c27ac7a0cb8a1d","name":"dannystu","image":{"@type":"ImageObject","@id":"http:\/\/www.dannysteynstudios.com\/blog\/#personlogo","inLanguage":"en-US","url":"http:\/\/0.gravatar.com\/avatar\/f007deaacf7b999368dd6553e456b5f9?s=96&d=mm&r=g","contentUrl":"http:\/\/0.gravatar.com\/avatar\/f007deaacf7b999368dd6553e456b5f9?s=96&d=mm&r=g","caption":"dannystu"},"url":"http:\/\/www.dannysteynstudios.com\/blog\/author\/dannystu\/"}]}},"_links":{"self":[{"href":"http:\/\/www.dannysteynstudios.com\/blog\/wp-json\/wp\/v2\/posts\/928"}],"collection":[{"href":"http:\/\/www.dannysteynstudios.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.dannysteynstudios.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.dannysteynstudios.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.dannysteynstudios.com\/blog\/wp-json\/wp\/v2\/comments?post=928"}],"version-history":[{"count":1,"href":"http:\/\/www.dannysteynstudios.com\/blog\/wp-json\/wp\/v2\/posts\/928\/revisions"}],"predecessor-version":[{"id":1026,"href":"http:\/\/www.dannysteynstudios.com\/blog\/wp-json\/wp\/v2\/posts\/928\/revisions\/1026"}],"wp:attachment":[{"href":"http:\/\/www.dannysteynstudios.com\/blog\/wp-json\/wp\/v2\/media?parent=928"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.dannysteynstudios.com\/blog\/wp-json\/wp\/v2\/categories?post=928"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.dannysteynstudios.com\/blog\/wp-json\/wp\/v2\/tags?post=928"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}